The University of Tulsa  |  McDougall School of Petroleum Engineering  |  Contact TUALP


TUALP Virtual Tour
 

 

ESP viscosity performance test flow loop

 

ESP Two-Phase Performance Test Facility

 

Test well (2,360 ft deep dummy well with 10-3/4 in. casing)

 

Test well current completion scheme

 

Erosion Test Facility – Outdoor Equipment

 

Erosion Test Facility – Indoor test section

 

Beam Pumping Unit – Morgan 320-305-100

 

Beam Pumping Unit – Lufkin Mark II M-160D-173-86

 

85 ft tower for testing hydraulic, jet, and electric submersible pumps

 

50 ft angle-adjustable tower to study inclination effect on natural separation efficiency in ESP assembly

 

150 bbl Two-Phase Gas/Liquid Horizontal Separator
(Convertible to Three-Phase Oil-Water-Gas Horizontal Separator)

 

268 scf High Pressure Tube Trailer

 

I-R 2RDS Air Compressor driven by a Waukesha 3521 GL gas engine (3.5 MM SCFD at 600 psig)

 

Gas-Lift Valve Performance Test Facility (pressures up to 2500 psia and flow rates up to 3.5 MM scf/D)

 

Gas-lift Valve Leak Test Fixture

 

Additionally, we have fruit trees in our outdoor facilities

 

Back to Home Page
 

 Comments are welcome
   

Last updated October 07, 2013